Doesn’t look like it’s gonna happen in October…… [ bummer ] Car is looking good, but there’s no way it will get done in time so, on to Plan D.
Plan D consists of:
1] Finishing the ‘Liner
2] Bringing it to Ontario and placing all decals and lettering
3] Running it on the chassis dyno
4] Modeling it for FloWorks
5] Running it at El Mirage [ if it doesn't rain ]
6] Taking photos of it at a photo studio nearby [ maybe with the Double Dually, although that would be 65' to photograph..... ]
7] Maybe a magazine story with the detailed photos. The theme? How hard it is to build a fast [ and safe ] car to go over 400 MPH…..
8] Plan for 2010